Veerrakhavan Natarajan

QAManager
September 10, 1958

About Candidate

I am having 27.50 Years of experience in Saudi Aramco EPC Projects as QA/QC Manager in Saudi Arabia, Consider additional skills such as •Saudi Aramco Standards and Procedures • Project Quality Plans • Procurement Quality Control Plan• Quality Management Systems• Inspection and Test Plans •Non-Conformance Reports• QMIS/EPM• Piping, Mechanical, E & I and Coating Inspection• Vendor and Supplier Quality Management, PMCC.MCC and Pre commissioning and Commissioning new Oil and Gas Saudi Aramco Projects.

Educational Qualification-Bachelor of Engineering -Mechanical, Certified Welding Inspector-AWS- CAWI, Certified Coating Inspector-NACE Level I, Level II,ASNT-PT, MPT, UT, RT, VT, RTFI, Level -II, Quality Management Systems Auditor/Lead Auditor Training Course ISO 9001-2008, Lead Auditor / Quality Management System -TUVE IRCA ISO 9001-2015,CNC Machine Operation and Programming, Computer Aided Designing-CAD, Primavera Project Planning, MIE,AMNIQA,

Responsibilities Covered:

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements

Saudi Aramco Standards and Procedures, Project Quality Plans, Procurement Quality Control, Quality Management Systems, Inspection and Test Plans, Non-Conformance Reports, QMIS/EPM, Piping, Mechanical, and Coating Inspection, Vendor and Supplier Quality Management,Position Details: Aramco Project experience-QAM/QCM(EPC=Engineering Procurement and Construction)-27Years-Total experience-41 Years+9 Months in the Engineering Field. Total Abroad experience(Saudi Arabia+ Qatar)=27Years+6months-TotalQA/QC Manager experience=12Years+3months and Technical Manager=7Months, Procurement QC Supervisor(PQCS)=4Years+2Months and Mechanical QC Supervisor=4Months, and QC Painting and Coating Inspector=8Years+7Months, and QC Mechanical Inspector=1 Year+7Months, Performing QC Inspection and Testing of Industrial Project Materials and facilities under construction, Inspection and Testing activities, related to the scope of Work, INDIA experience=Works Manager=3 Months, Production Manager=1Year, R&D Engineer=6Years, Design &Development Engineer=7 Years

Location

Education

B
BE Mechanical Engineering 1986
Bachler's Degree

Educational Qualification-Bachelor of Engineering -Mechanical, Certified Welding Inspector-AWS- CAWI, Certified Coating Inspector-NACE Level I, Level II,ASNT-PT, MPT, UT, RT, VT, RTFI, Level -II, Quality Management Systems Auditor/Lead Auditor Training Course ISO 9001-2008, Lead Auditor / Quality Management System -TUVE IRCA ISO 9001-2015,CNC Machine Operation and Programming, Computer Aided Designing-CAD, Primavera Project Planning, MIE,AMNIQA,

Work & Experience

P
Project QA Manager Jan 2026 - Jul 2026
JGC ARABIA CO.LTD

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

P
Project QA Manager May 2025 - Nov 2025
CAT International LLC

As a Project QA Manager in Saudi Aramco (EPC) Projects ►Successfully organized and assembled a qualified Quality Team for the Project by conducting interviews and securing approvals from Saudi Aramco ►Developed and scheduled QA/QC activities for each discipline, ensuring efficient allocation of QC Personnel ►Monitored project site quality activities to ensure compliance with Saudi Aramco standards, facilitating timely execution by all QC disciplines ► Actively engaged in quality control interactions, enhancing communication and collaboration within the team ►Demonstrated strong leadership and Project management skills, contributing to the overall success of QA/QC, initiatives ►Fostered a culture of Quality and compliance, ensuring adherence to Saudi Aramco Standards Engineering Procedures and Specifications ►Attending client Saudi Aramco weekly all meetings(Procurement, Construction and Progress) action items followed and closed ►Organizing and conducting Top Management Review Meetings and Weekly Quality Meetings for the QMS improvements.

Q
QA Manager Nov 2024 - Apr 2025
Larsen & Toubro - Saudi Arabia

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

Q
QA/QC Manager May 2024 - Oct 2024
Saudi Arabia- Jubail Gulf Re

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

Q
Quality Control Manager (QCM) Feb 2023 - Feb 2024
Gulf Reinforced Plastics Branch

(a) Attending Saudi Aramco Weekly All Meetings, (Weekly Quality Meeting, Weekly Progress Meeting, etc., ) (b) Interaction with Main Contractor (SAMSUNG)/Client Saudi Aramco and follow up action, and Comply as per Project QA/QC requirements, (c) Conducting Quality Meetings-Gulf Reinforced Plastics(GRP), at the Main Contractor (SAMSUNG) Conference Hall, on regular basis, (d)Trouble Shooting the QA/QC activities and complying the Saudi Aramco Standard requirements, as QC Manager, (e) Preparation of Project Quality Plan, and QA/QC documents verifying and ensuring the correctness of the Quality documents before Submitting to Saudi Aramco, (f)Preparation of Project Quality Control Procedures as QC Manager and review and correcting as per the Saudi Aramco Standard requirement and Submitting to Saudi Aramco and getting approval, (g)Submitting all the Quality Submittals for Saudi Aramco, after review and correcting before submitting to Saudi Aramco for approval, and Complying all the Saudi Aramco-review Comments, resubmitting and getting final approvals, (h) Organizing the Project site Quality Team for each discipline QC personnel’s preliminary interview by QCM, and arranging interviews with Main Contractor (SAMSUNG) /Client Saudi Aramco and getting approvals, (i) Monitoring and ensuring all the Quality requirements are full filled by the Quality Team at Project Site as per Saudi Aramco standard requirement, (j) Ensuring and take necessary action for the Quality Management System (QMS) improvements in the Project, working as Project QA Manager and as Project QC Manager.

Q
Quality Control Manager (QCM) Jan 2022 - Feb 2023
Hanbo Engineering &Construction Co. Ltd.

(a) Attending Saudi Aramco Weekly All Meetings, (Weekly Quality Meeting, Weekly Progress Meeting, etc., ) (b) Interaction with Main Contractor (SAMSUNG)/Client Saudi Aramco and follow up action, and Comply as per Project QA/QC requirements, (c) Conducting Quality Meetings-Gulf Reinforced Plastics(GRP), at the Main Contractor (SAMSUNG) Conference Hall, on regular basis, (d)Trouble Shooting the QA/QC activities and complying the Saudi Aramco Standard requirements, as QC Manager, (e) Preparation of Project Quality Plan, and QA/QC documents verifying and ensuring the correctness of the Quality documents before Submitting to Saudi Aramco, (f)Preparation of Project Quality Control Procedures as QC Manager and review and correcting as per the Saudi Aramco Standard requirement and Submitting to Saudi Aramco and getting approval, (g)Submitting all the Quality Submittals for Saudi Aramco, after review and correcting before submitting to Saudi Aramco for approval, and Complying all the Saudi Aramco-review Comments, resubmitting and getting final approvals, (h) Organizing the Project site Quality Team for each discipline QC personnel’s preliminary interview by QCM, and arranging interviews with Main Contractor (SAMSUNG) /Client Saudi Aramco and getting approvals, (i) Monitoring and ensuring all the Quality requirements are full filled by the Quality Team at Project Site as per Saudi Aramco standard requirement, (j) Ensuring and take necessary action for the Quality Management System (QMS) improvements in the Project, working as Project QA Manager and as Project QC Manager.

Q
Quality Control Manager (QCM) Jun 2020 - Nov 2021
Fahhad Contracting Company, (FCC)

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

P
Procurement Quality Control Supervisor Feb 2020 - May 2020
Diversified Lines For Petroleum Services (DLPS)

As PQCS Reviewing of MR -Material Requisition received from Design Engineering and after review comments are complied by Design. Final review by PQCS and submit to SAUDI ARAMCO for approval, and further SA review comments complied and get approvals, 2.Attending SAUDI ARAMCO weekly meetings and responding Job responsibilities accordingly, 3.Preparation and reviewing of IAP-Inspection Assignment Packages, and submitting to SAUDI ARAMCO and SA review comments if any complied and getting approvals, 4.Communicating through Emails-Client SAUDIARAMCO, Internal Departments of the Company, and communicating to Suppliers, Vendors, and Manufacturer’s, etc., 5.Reviewing of NMR-601.NMR-602, and NMR-603, and getting corrected from, Vendor, Manufacturer, and from Designer for Technical requirements as per Project Specification’s and ensuring the suitability for International Standard’s and for SAUDI ARAMCO Standards and Procedures, 6.Reviewing of Purchase Order’s (PO), for Technical Review’s.

P
Project QA/QC Manager Oct 2019 - to Jan 2020
Al Khodari & Sons co

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

P
Project QA/QC Manager Dec 2018 - Jan 2019
Nesma Tata Projects Limited

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

P
Project QA/QC Manager Nov 2017 - Sep 2018
Mohamed Al OJaime Cont. Est.

►Successfully organized and assembled a qualified Quality Team for the Project by conducting interviews and securing approvals from Saudi Aramco ►Developed and scheduled QA/QC activities for each discipline, ensuring efficient allocation of QC Personnel ►Monitored project site quality activities to ensure compliance with Saudi Aramco standards, facilitating timely execution by all QC disciplines ► Actively engaged in quality control interactions, enhancing communication and collaboration within the team ►Demonstrated strong leadership and Project management skills, contributing to the overall success of QA/QC, initiatives ►Fostered a culture of Quality and compliance, ensuring adherence to Saudi Aramco Standards Engineering Procedures and Specifications ►Attending client Saudi Aramco weekly all meetings(Procurement, Construction and Progress) action items followed and, closed ►Organizing and conducting Top Management Review Meetings and Weekly Quality meetings for the QMS improvements

P
Procurement Quality Control Supervisor Feb-2017 - Jul-2017
Technicas Reunites (TRG)

As PQCS Reviewing of MR -Material Requisition received from Design Engineering and after review comments are complied by Design. Final review by PQCS and submit to SAUDI ARAMCO for approval, and further SA review comments complied and get approvals, 2.Attending SAUDI ARAMCO weekly meetings and responding Job responsibilities accordingly, 3.Preparation and reviewing of IAP-Inspection Assignment Packages, and submitting to SAUDI ARAMCO and SA review comments if any complied and getting approvals, 4.Communicating through Emails-Client SAUDIARAMCO, Internal Departments of the Company, and communicating to Suppliers, Vendors, and Manufacturer’s, etc., 5.Reviewing of NMR-601.NMR-602, and NMR-603, and getting corrected from, Vendor, Manufacturer, and from Designer for Technical requirements as per Project Specification’s and ensuring the suitability for International Standard’s and for SAUDI ARAMCO Standards and Procedures, 6.Reviewing of Purchase Order’s (PO), for Technical Review’s.

P
Procurement Quality Control Supervisor May -2016 - Jan- 2017
Alfanar, KSA

1.As PQCS Reviewing of MR -Material Requisition received from Design Engineering and after review comments are complied by Design. Final review by PQCS and submit to SAUDI ARAMCO for approval, and further SA review comments complied and get approvals, 2.Attending SAUDI ARAMCO weekly meetings and responding Job responsibilities accordingly, 3.Preparation and reviewing of IAP-Inspection Assignment Packages, and submitting to SAUDI ARAMCO and SA review comments if any complied and getting approvals, 4.Communicating through Emails-Client SAUDIARAMCO, Internal Departments of the Company, and communicating to Suppliers, Vendors, and Manufacturer’s, etc., 5.Reviewing of NMR-601.NMR-602, and NMR-603, and getting corrected from, Vendor, Manufacturer, and from Designer for Technical requirements as per Project Specification’s and ensuring the suitability for International Standard’s and for SAUDI ARAMCO Standards and Procedures, 6.Reviewing of Purchase Order’s (PO), for Technical Review’s, and suitability of International Standard’s and SAUDI ARAMCO Standards, and Procedures. Before submitting to Client SAUDI ARAMCO and getting approvals, 7.Reviewing of Quality Procedures from Vendor, Manufacturer, from Designer, and Company Quality Procedures, and getting corrected before submitting to SAUDI ARAMCO, submitting and SA comments complied and getting approvals, 8.Co ordinating with Supplier, Vendor, Manufacturer, and TPI ( Third Party Inspectors ) and SAPMT/VID, and sending Inspection Notification’s, arranging TPI Inspection’s and receiving Inspection reports, IRC, and Quality Reports .reviewing and getting corrected and submitting to SAUDI ARAMCO and getting approvals, 9.Conducting supplier surveys, and Supplier Evaluation, accordingly, releasing the PO’s for the approved Supplier’s, Vendors, Manufacturer’s 10.Reviewing all the Quality Submittals and correcting it before submitting to SAUDI ARAMCO and SA comments complied and getting approvals.

Q
QA Manager Oct-2015 - Feb-2016
Saudi Arabian Kentz Co. KSA

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

Q
QA Manager Jun-2015 - Sep-2015
Saudi Arabian Baytur Const. Co.

►Successfully organized and assembled a qualified Quality Team for the Project by conducting interviews and securing approvals from Saudi Aramco ►Developed and scheduled QA/QC activities for each discipline, ensuring efficient allocation of QC Personnel ►Monitored project site quality activities to ensure compliance with Saudi Aramco standards, facilitating timely execution by all QC disciplines ► Actively engaged in quality control interactions, enhancing communication and collaboration within the team ►Demonstrated strong leadership and Project management skills, contributing to the overall success of QA/QC, initiatives ►Fostered a culture of Quality and compliance, ensuring adherence to Saudi Aramco Standards Engineering Procedures and Specifications ►Attending client Saudi Aramco weekly all meetings(Procurement, Construction and Progress) action items followed and, closed ►Organizing and conducting Top Management Review Meetings and Weekly Quality meetings for the QMS improvements

Q
QA Manager Jun -2013 - Feb-2015
H.K. Al Sadiq Sons Contracting Company

1.As a Project QA Manager, Organized all the Quality Personnel required for the Project (Quality Team) by interviews then submitting to Saudi Aramco for approvals and getting approvals from the client.2. QA/QC activities scheduling for each discipline of QC personnel and monitoring the Quality Team.3. Monitoring the Project site Quality activities are carried out by each discipline QC personnel’s Timely and meeting the Saudi Aramco Standard requirements.4. Interaction as a QA/QC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the client (Saudi Aramco) requirements.5. Monitoring the QA/QC activities of Project and ensure properly raised RFI’S in QMIS/EPM of Aramco and guiding for the proper contractor reply in QMIS by QC supervisor and also updating the necessary completion of PID comments.6. Preparation of Project Quality Procedures and review and correcting as per the Saudi Aramco Standard requirement and submitting to Saudi Aramco and getting approvals.7. Monitoring and troubleshooting all the Project Site Quality issues and submitting action plan to Saudi Aramco and solving.8. Ensured and take necessary action for the QMS (Quality Management System) improvements in the Project worked as QC Manager and Project QA Manager.9. Ensured and by Monitoring the QA/QC Team for Proper functioning of all Quality activities as per the Project Site Quality requirements in the field for example (a) All Civil Quality activities (b) All Mechanical Quality activities, Piping, Structural, Supports, etc., (c) All Electrical Quality activities, (d) All Instrumentation Quality activities, ( e) And all other necessary Quality requirements as per approved IFC Drawings, approved PQP, approved Quality Procedures.10. Interaction as QA/QCC Manager with PID of Aramco and solving the Quality issues and taking necessary action to meet the Saudi Aramco requirements.

Q
Quality Control Manager (QCM) Mar -2012 - Oct- 2012
Global IWI Arabia Ltd., KSA

(a) Attending Saudi Aramco Weekly All Meetings, (Weekly Quality Meeting, Weekly Progress Meeting, etc., ) (b) Interaction with Main Contractor (SAMSUNG)/Client Saudi Aramco and follow up action, and Comply as per Project QA/QC requirements, (c) Conducting Quality Meetings-Gulf Reinforced Plastics(GRP), at the Main Contractor (SAMSUNG) Conference Hall, on regular basis, (d)Trouble Shooting the QA/QC activities and complying the Saudi Aramco Standard requirements, as QC Manager, (e) Preparation of Project Quality Plan, and QA/QC documents verifying and ensuring the correctness of the Quality documents before Submitting to Saudi Aramco, (f)Preparation of Project Quality Control Procedures as QC Manager and review and correcting as per the Saudi Aramco Standard requirement and Submitting to Saudi Aramco and getting approval, (g)Submitting all the Quality Submittals for Saudi Aramco, after review and correcting before submitting to Saudi Aramco for approval, and Complying all the Saudi Aramco-review Comments, resubmitting and getting final approvals, (h) Organizing the Project site Quality Team for each discipline QC personnel’s preliminary interview by QCM, and arranging interviews with Main Contractor (SAMSUNG) /Client Saudi Aramco and getting approvals, (i) Monitoring and ensuring all the Quality requirements are full filled by the Quality Team at Project Site as per Saudi Aramco standard requirement, (j) Ensuring and take necessary action for the Quality Management System (QMS) improvements in the Project, working as Project QA Manager and as Project QC Manager.

P
Procurement Quality Control Supervisor May-2011 - Mar-2012
Mohd. Al Mojil Group Company, KSA.

1.As PQCS Reviewing of MR -Material Requisition received from Design Engineering and after review comments are complied by Design. Final review by PQCS and submit to SAUDI ARAMCO for approval, and further SA review comments complied and get approvals, 2.Attending SAUDI ARAMCO weekly meetings and responding Job responsibilities accordingly, 3.Preparation and reviewing of IAP-Inspection Assignment Packages, and submitting to SAUDI ARAMCO and SA review comments if any complied and getting approvals, 4.Communicating through Emails-Client SAUDIARAMCO, Internal Departments of the Company, and communicating to Suppliers, Vendors, and Manufacturer’s, etc., 5.Reviewing of NMR-601.NMR-602, and NMR-603, and getting corrected from, Vendor, Manufacturer, and from Designer for Technical requirements as per Project Specification’s and ensuring the suitability for International Standard’s and for SAUDI ARAMCO Standards and Procedures, 6.Reviewing of Purchase Order’s (PO), for Technical Review’s, and suitability of International Standard’s and SAUDI ARAMCO Standards, and Procedures. Before submitting to Client SAUDI ARAMCO and getting approvals, 7.Reviewing of Quality Procedures from Vendor, Manufacturer, from Designer, and Company Quality Procedures, and getting corrected before submitting to SAUDI ARAMCO, submitting and SA comments complied and getting approvals, 8.Co ordinating with Supplier, Vendor, Manufacturer, and TPI ( Third Party Inspectors ) and SAPMT/VID, and sending Inspection Notification’s, arranging TPI Inspection’s and receiving Inspection reports, IRC, and Quality Reports .reviewing and getting corrected and submitting to SAUDI ARAMCO and getting approvals, 9.Conducting supplier surveys, and Supplier Evaluation, accordingly, releasing the PO’s for the approved Supplier’s, Vendors, Manufacturer’s 10.Reviewing all the Quality Submittals and correcting it before submitting to SAUDI ARAMCO and SA comments complied and getting approvals.

D
Detasad Procurement Quality Control Sup Apr-2010 - Nov-2010
Detasad Procurement Quality Control Supervisor

1.As PQCS Reviewing of MR -Material Requisition received from Design Engineering and after review comments are complied by Design. Final review by PQCS and submit to SAUDI ARAMCO for approval, and further SA review comments complied and get approvals, 2.Attending SAUDI ARAMCO weekly meetings and responding Job responsibilities accordingly, 3.Preparation and reviewing of IAP-Inspection Assignment Packages, and submitting to SAUDI ARAMCO and SA review comments if any complied and getting approvals, 4.Communicating through Emails-Client SAUDIARAMCO, Internal Departments of the Company, and communicating to Suppliers, Vendors, and Manufacturer’s, etc., 5.Reviewing of NMR-601.NMR-602, and NMR-603, and getting corrected from, Vendor, Manufacturer, and from Designer for Technical requirements as per Project Specification’s and ensuring the suitability for International Standard’s and for SAUDI ARAMCO Standards and Procedures, 6.Reviewing of Purchase Order’s (PO), for Technical Review’s, and suitability of International Standard’s and SAUDI ARAMCO Standards, and Procedures. Before submitting to Client SAUDI ARAMCO and getting approvals, 7.Reviewing of Quality Procedures from Vendor, Manufacturer, from Designer, and Company Quality Procedures, and getting corrected before submitting to SAUDI ARAMCO, submitting and SA comments complied and getting approvals, 8.Co ordinating with Supplier, Vendor, Manufacturer, and TPI ( Third Party Inspectors ) and SAPMT/VID, and sending Inspection Notification’s, arranging TPI Inspection’s and receiving Inspection reports, IRC, and Quality Reports .reviewing and getting corrected and submitting to SAUDI ARAMCO and getting approvals, 9.Conducting supplier surveys, and Supplier Evaluation, accordingly, releasing the PO’s for the approved Supplier’s, Vendors, Manufacturer’s 10.Reviewing all the Quality Submittals and correcting it before submitting to SAUDI ARAMCO and SA comments complied and getting approvals

M
Mechanical QC Supervisor Oct- 2009 - Jan- 2010
CAT-Contracting & Trading Co.

As a Mechanical QC Supervisor Preparation of Two Weeks Look Ahead Schedule, and submitting to the Client (Saudi Aramco) timely, Preparation of Quality Control Procedures and getting approval from Saudi Aramco. Monitoring all QC Team in the site Quality activities. Updating all the necessary Quality documents in the Project.
Updating the NCR Logs, LBE Logs and INCR Logs and Measuring Equipment’s and Tools Log, Interaction with PID in the project site and solving the Quality issues. Attending the Weekly Quality Meetings, Weekly Progress meetings, and solving the comments as per client -Saudi Aramco weekly MOM.

Q
QC Coating Inspector Mar-2008 - Oct-2008
Snamprogetti / Saudi Arabian Saipem Ltd.

Painting & Coatings Activities: * Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipments and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations.Record spool numbers and paint specs plus color code.

Q
QC Coating Inspector Apr 2007 - to Feb 2008
Saudi Arabian Saipem Ltd.

Painting & Coatings Activities: * Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

Q
QC Coating Inspector Feb-2007 - Apr-2007
Metals Services for Trading and Contracting Company

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

M
Mechanical QA/QC Inspector Mar -2005 - Feb-2007
Al-Swiatek Support Services

As a Mechanical QA/ QC Inspector prepare all the required documents for site inspection, Monitor the inspection activities before raising the RFI and ensure the Quality activities are as per Approved Quality Procedures nd as per applicable Saudi Aramco Standard requirements. Raising the RFI and witnessed by SAPID,if any comments corrected and rectified by Construction and accepted by the client Saudi Aramco. Completed Quality documents dully completed and signed by SAPMT and SAPID and hand over to document controller for uploading in IQMS/ EPM. Monitoring and raising INCR appropriately for Std violations, and other, IF drawing, Project Specification, and Not following of approved Quality procedure, violations and submitting to the Client -Saudi Aramco, follow-up and closing. Updating the NCR Logs, LBE Logs and INCR Logs and Measuring Equipment’s and Tools Log, Maintaining all the required Inspection Quality documents and updating timely.

Q
QC Coating Inspector Apr -2004 - Jul-2004
Al-Suwaiket Support Services

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

Q
QC Coating Inspector May-2003 - Mar-2004
Al-Suwaiket Support Services

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

Q
QC Mechanical Inspector Oct-2001 - Apr-2003
Al-Suwaiket Support Services

As a Mechanical QA/ QC Inspector prepare all the required documents for site inspection, Monitor the inspection activities before raising the RFI and ensure the Quality activities are as per Approved Quality Procedures nd as per applicable Saudi Aramco Standard requirements. Raising the RFI and witnessed by SAPID,if any comments corrected and rectified by Construction and accepted by the client Saudi Aramco. Completed Quality documents dully completed and signed by SAPMT and SAPID and hand over to document controller for uploading in IQMS/ EPM. Monitoring and raising INCR appropriately for Std violations, and other, IF drawing, Project Specification, and Not following of approved Quality procedure, violations and submitting to the Client -Saudi Aramco, follow-up and closing. Updating the NCR Logs, LBE Logs and INCR Logs and Measuring Equipment’s and Tools Log, Maintaining all the required Inspection Quality documents and updating timely

C
Coating Inspector Oct-2000 - Sep 2001
Al-Suwaiket Support Services

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

Q
QC Coating Inspector Aug -1999 - Sep 2000
Petrochemical Olifins

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code.

Q
QC Coating Inspector Jul 1998 - Aug 1999
Saudi Petrochemical Company - Sadaf

Painting & Coatings Activities: Review all paints & coating specification, manufacturer’s product data sheet, Painting crew approvals, equipment calibration certificates, safety standards and other paints / coatings related documents. Monitor the Grit Blasting activities to comply with the required standard. Conduct surface profile measurements with the press-0-film paper. Ensure surface cleanliness prior to coating application (primer / topcoat). Monitor and check wet film / dry film requirements as per standard. Inspect coatings for any paint defects for touch up repair. Raise RFI for final inspection / acceptance from Client representative. Monitoring, Witnessing, Inspection & Documentation of all paints & coatings activities offsite & onsite. * Grit blasting; Critical coating applications, priming & top coating of various sizes of pipe spools to be insulated & un-insulated lines for various services. Prepare inspection report for final inspection & acceptance of owner’s representative. Ensure the use of correct blasting and painting materials as per the requirements of construction drawings and painting data sheet. Perform holiday testing of underground piping to ensure that all coating defects are repaired prior to backfilling. Verify and ensure the correct painting materials and correct procedure for the painting applications. Check weather conditions for rain, Fog, Sandstorm etc. Inspect all Equipment’s and instruments prior to Blasting and Coating. Monitor all Painting activities. Prepare all inspection reports. Identify defective works and prepare reports indicating the violations. Record spool numbers and paint specs plus color code

T
Technical Manager Apr -1997 - Sep-1997
Seashore Engg.Contracting

Monitoring the activities of QA/QC Team in the Project

W
Works Manager Jan-1997 - Mar-1997
Rita Pad Printing Systems

Overall control of the Factory

P
Production Manager Nov-1995 - Dec-1996
Hitech Agro Projects

Overall control of Production and Quality of the Products

R
R & D – Mechanical Engineer Aug-1988 - Feb-1994
Lohia machines Limited

Research and Development Mechanical engineer

D
Design & Development Engineer May-1978 - Jul-1985
Sri Ranga Industries

Overall in charge of Design & Development Engineering